Rendering of Sumner High Master Plan

Sumner High School Master Plan

Sumner High School is currently at 97% capacity

Many portions of SHS are old and outdated, with systems requiring increased maintenance. 

Proposition 1 would make districtwide improvements, including rebuilding and expanding Sumner High School to be a modern, safe and ADA-compliant facility. 

SHS-specific improvements through Prop. 1

  • New Performing Arts Center, gym and pool

  • New CTE labs and band room

  • Wider hallways for increased safety and accessibility 

  • Multi-use, lighted turf fields for baseball, fastpitch and soccer

  • Lighted tennis courts

  • Increased parking   

Estimated cost: $412.2M


Background: 

SHS originally constructed:

  • Main Building: 1954
  • Stadium: 1958
  • Pool: 1969
  • PAC, greenhouses: 1979
  • Phase 1 addition: 2023

Location: 1707 Main Street, Sumner

Replacing an aging pool for Sumner & Bonney Lake
Prop. 1: An up-to-date band room at SHS
SHS Master Plan Site Plan

SHS Master Site Plan

Main entrance of Sumner High School

Sumner High School main entrance

Ceiling in need of repair

Ceiling in need of repair

A weathered boiler shows its age

An aged boiler in the pool building

Current SHS pool

Current SHS pool

Current Sumner High School pool exterior

SHS Pool Interior

Current Sumner High School pool interior

Current condition: Pool has outlived its useful life and is functionally outdated; uneven, settling floors; an older boiler; cracks in the pool; an inoperable warm-water pool, an inoperable diving platform; the pool is not competition compliant to host meets or water polo

Year built: 1969 (modernized in 1985)

Spectator seating: 220

A crack in the interior wall of the pool

A crack in the wall inside the pool building

New SHS pool

SHS pool rendering

Sumner High School Master Plan Pool Rendering

Features:

  • 8-lane, 25-yard competition pool (75' x 60')
  • 6.5' deep at starting blocks, 4' deep at shallow end
  • Dive well (60’x40'), 2 diving boards; may also function as practice lanes
  • Allows for water polo matches
  • Improved warm-water therapy pool
  • Increased spectator seating
  • Parking adjacent to pool for easy accessibility
  • 50-year lifespan

Benefits:

  • USA Swim compliant; able to host meets and competitions
  • Safe and secure; controlled access to the school
  • Venue for community swim lessons and other water safety activities
  • Open for community use, attractive to prospective facility renters

Spectator seating: 400 (approximately)

Current SHS Performing Arts Center

SHS PAC Exterior

Current Sumner High School PAC

Exterior of Sumner High School PAC

Exterior of SHS PAC

  • Current condition: Aging facility with poor acoustics; settling floor; substantial improvements needed; new roof; HVAC, mechanical systems and exterior siding
  • Year built: 1979
  • Square footage: 24,000 (includes lobby and restrooms)

New SHS Performing Arts Center

New SHS PAC rendering

Sumner High School Master Plan PAC Rendering

Features:

  • Orchestra pit to accommodate musicians and to provide unobstructed view of the audience for performances
  • Tablet-arm seating conducive for school-wide testing
  • Strong, stable floor to support heavy instruments and performance set needs
  • Prominent and aesthetically-pleasing lobby visible from Main Street
  • Easily accessible and connected to music and performing arts departments
  • 50-year lifespan

Benefits:

  • Greater security and control with view corridors
  • Resource-efficient footprint allows for greater long-term value and security
  • Location allows for maximum site usage for SHS replacement
  • Direct connection to music rooms and other performing arts instruction areas provides enhanced student learning
  • Attractive to prospective facility renters; enhanced security with no access to the school

Square Footage: 28,000 (approximately)

Seating capacity: 750 (approximately)

Current SHS Gym

Old SHS gym

Current Sumner High School gym exterior

SHS gym interior

Limited ADA accessibility and capacity in SHS gym

Current condition: Aging facility, too small for student population; increasing capacity would require substantial structural revisions

Year built: 1992

Square footage: 35,000

Seating capacity: 1,200

New SHS gym

New SHS gym rendering

Sumner High School Master Plan Gym Rendering

Features:

  • Increased capacity to accommodate 1,800 seats with current ADA compliant seating
  • College-sized court, conducive for hosting tournaments
  • Allows for partitioning to provide two full-sized courts
  • 50-year life span

Benefits

  • Resource-efficient footprint
  • Location allows for maximum site usage for SHS replacement
  • Provides sufficient locker rooms for school teams and visiting teams
  • Areas for wrestling, a fitness center, and sports medicine facilities
  • Parking adjacent to gym for easy accessibility to athletic events
  • Aesthetically pleasing view from Main Street
  • Available for rentals; enhanced security of facility with controlled access to the school

Square footage: 46,800 (approximately)

Seating capacity: 1,800 (approximately)

Districtwide improvements through Prop. 1

Prop. 1 would make school improvements in teaching and learning environments that support student achievement and relieve student overcrowding at nearly all schools, including:

Other districtwide improvements, varying by school, include: 

  • Updated learning technology
  • Make classroom and facility improvements for expanded career/technical education
  • Replacing aging roofs
  • Make Americans with Disabilities Act (ADA) accessibility improvements 
  • Improve mechanical systems for clean air/water and energy efficiency
  • Add multi-use synthetic turf fields for students/community
  • Improve health/safety/security