Feb 2024 Election
Page Navigation
Performing Arts Center
-
Phase 2: Replacement PAC
- Features:
- Orchestra pit to accommodate musicians and to provide unobstructed view of the audience for performances
- Tablet-arm seating conducive for school-wide testing
- Strong, stable floor to support heavy instruments and performance set needs
- Prominent and aesthetically-pleasing lobby visible from Main Street
- Easily accessible and connected to music and performing arts departments
- 50-year lifespan
- Benefits:
- Greater security and control with view corridors
- Resource-efficient footprint allows for greater long-term value and security
- Location allows for maximum site usage for SHS replacement
- Direct connection to music rooms and other performing arts instruction areas provides enhanced student learning
- Attractive to prospective facility renters; enhanced security with no access to the school
- Square Footage: 28,000 (approximately)
- Seating capacity: 750 (approximately)
Current PAC
- Current condition: Aging facility with poor acoustics; settling floor; substantial improvements needed; new roof, HVAC, mechanical systems and exterior siding
- Year built: 1979
- Square footage: 24,000 (includes lobby and restrooms)
- Features: